In order to minimize the use of artificial lighting, increase energy efficiency and reduce carbon emissions, our factory and office building is designed to utilize maximum daylight
The amount of water treated in the treatment facility;
Industrial wastewater: 50 m³/per day
A solar energy system was installed over an area of 5,000 m².
With the energy produced, 295,200 tons of carbon emissions are prevented annually.
In winter, our factory is fully heated by the economizer heat recovery system that collects waste gasthe melting furnaces.
200 m³ of natural gas is recovered daily.